Responsive image
The First-stage of Line 4 of Chengdu Metro will Finish Track Laying Soon and Will Begin Trial Run At the End of 2015
发布时间:2015-03-05

As Spring Festival over, Chengdu Metro begins busy construction. The constructers have been busy with construction of first-stage of Line 4 and Line 7 since the vacation. The two projects have entered home stretch of track laying. The constructers gave up their vacation to accelerate the construction of Chengdu Metro.

MODESTY TO WIN THE MARKET AND PASSION TO CREATE THE VALUE
©2010-  Chengdu Alga Engineering New Technology Development Co.,Ltd.
all rights reserved