After more than 2,200 days of hard work, the Xiaoxiangling Tunnel of the Xincheng-Kunming Railway successfully broke through on June 21, which is the longest tunnel under construction on the Xincheng-Kunming Railway and the last tunnel on the entire line that needs to be pierced.