On September 11th, at about 20 o'clock, with the completion of the last T-beam of the Lalin Railway line on the two-line bridge at Jiage Station, the construction of all the 2364-hole T-beams of the whole line has been completed. So far, all 120 bridges on the Larin Railway have been successfully built.