Responsive image
The Main Structure of Shenzhen Metro Line 6 Branch Station was Capped
发布时间:2020-05-13

On the afternoon of May 8, the last concrete roof of Shenzhen Metro Line 6 was poured and capped at the east science city station(formerly Wuhan University Station) in the second engineering district.

MODESTY TO WIN THE MARKET AND PASSION TO CREATE THE VALUE
©2010-  Chengdu Alga Engineering New Technology Development Co.,Ltd.
all rights reserved