At 4:30 am on December 17, the Guizhou Wengma Railway, built by the China Railway 20th Bureau, connecting the Shanghai-Kunming Railway, smoothly opened the right line dial-up, station communication, signal interlock, power supply and electrification, laying the foundation for the scheduled opening and operation of the Wengma Railway.