Responsive image
Metro Line 6 Crosses the Lline Chengdu 1 and Fuqing Overpass Safely and Smoothly
发布时间:2019-06-06

Recently, line 6, 9 standard Renmin Road North - Liangjiaxiang shield section, after 60 hours of tunneling, safe and smooth down through the existing line 1 while ensure the safety of the existing line operation.

MODESTY TO WIN THE MARKET AND PASSION TO CREATE THE VALUE
©2010-  Chengdu Alga Engineering New Technology Development Co.,Ltd.
all rights reserved